PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Fireproofing the 4th floor Facing North.jpg Installing beams at Elev. 4 Facing South.jpg Started installing the metal framing around the perimeter of the roof Facing North-East.jpg Duct work at the 2nd floor Facing West.jpg Started painting the mockup at the Stairwell -2.jpg Installing duct work at the 2nd floor Facing North.jpg Installing duct work at the 2nd floor Facing West.jpg Installing metal framing around the roof perimeter (South Elevation).jpg Storm piping going into the secong floor Facing West.jpg
Previous pageNext page Started painting the mockup at the Stairwell -2
Started painting the mockup at the Stairwell -2